The L-6000 is a hand operated rivet-nut header tool for use with the following rivet-nut thread sizes: 4-40, 6-32, 8-32, 10-32, 10-24, 12-24, ¼-20, and ¼-28. Metric sizes: M3, M4, M5, and M6.
Operating Instructions:
L6000 Installation Tool (Refer to Fig. 1) Pull knob (A) completely out and place rivet-nut onto pull-up stud. Holding rivet-nut with fingers, push knob until it is all the way into the barrel (B). Rivet-nut should now have all the threads engaged onto the pull-up stud. Hold tool at a 90-degree angle to work properly, and place rivet-nut in hole. Squeeze handle (C) toward barrel (B) until resistance is felt. The handle will not touch the barrel. DO NOT apply excessive force or threads may be stripped. Release handle (C) and pull knob (A) completely out, this will release pull-up stud from rivet-nut.
 
Replacing Broken or Damage Pull-Up Studs:
  1. Unscrew anvil sleeve L-28 and remove. L
  2. Loosen 3 set screws, L-5 using the access hole with hex key (included), by rotating knob to expose set screws
  3. Loosen 2 set screws at access hole located below L-32 on barrel; again rotate knob.
  4. Unscrew pull-up stud by holding it firmly in place, a vise may be necessary to hold the pull-up stud. Turn entire tool counter clockwise to remove from coupling, L-20.
  5. Replace pull-up stud by reversing instructions. DO NOT DAMAGE OR SCAR PULL-UP STUD, THIS WILL PREVENT SMOOTH OPERATION WHILE STUD ROTATES IN ADJUSTABLE ANVIL, L-29.

    NOTE: If replacing pull-up stud with a different thread size, it requires changing adjustable anvil, L-29; collar, L-15, and in some cases; the coupling, L-20.
L6000 Installation Tool
Oiling:
A drop of oil at set screw openings on the barrel will keep the tool operating smoothly.

Back to Atlas

 

 

Home I Site Map I About Us I Products I Manufacturers I Services
Inventory Management I Tool Repair I RoHS I Line CardContact Us

 
sales@jetfitting.com
© 2003 Jet Fitting & Supply Corp.

714.558.9381
Fax: 714.541.4491